Customization: | Available |
---|---|
After-sales Service: | Lifelong |
Warranty: | 15 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model number | Bandwidth mm | Water content 80% original sludge treatment capacity (T/h) | Standard treatment capacity of absolutely dry sludge (DSkg/h) |
FL 1000 | 1000 | 2 | 400 |
FL 1500 | 1500 | 3.5 | 700 |
FL 2000 | 2000 | 6 | 1200 |
Model number | Band width mm | Height of sludge outlet from the ground | Machine size | ||
Length mm | Width mm | Height mm | |||
FL 1000 | 1000 | 850 | 5130 | 1900 | 2200 |
FL 1500 | 1500 | 850 | 5130 | 2400 | 2200 |
FL 2000 | 2000 | 850 | 5130 | 2900 | 2200 |
Model number | Main machine power (kw) | Power of fabric machine (kw) | Sludge modification equipment (kw) | Backwash water pump (kw) | Air compressor (kw) | Total power (kw) |
FL 1000 | 2.2 | 1.1 | 1.5 | 5.5 | 2.2 | 12.5 |
FL 1500 | 3 | 1.5 | 3 | 7.5 | 2.2 | 17.2 |
FL 2000 | 4 | 2.2 | 3 | 11 | 2.2 | 22.4 |
Sludge deep dewatering methods | Our new technology | High-pressure plate and frame deep dewatering technology |
Whether to dismantle existing facilities | Use of existing dewatering equipment | Need to dismantle existing equipment |
Installed power | The installed power of the complete system is tens of kilowatts, generally accounting for about 2 per cent of the total installed power of the sewage plant | Hundreds of kilowatts of installed power for complete systems, generally accounting for about 15 per cent of the total installed power of a sewage plant, or even the need to apply for additional power capacity |
Occupied area | Floor-to-ceiling installation, generally can use the sludge transport room spare site layout, significantly shorten the project construction period | Requires the installation of platforms, occupies a large area, the existing building is difficult to depreciate, and even need to apply for additional land |
Operation | Continuous operation, automatic discharge of sludge cake, simple operation. | Intermittent operation, the mud cake needs to be shovelled down by workers, which is difficult to operate |
Safety | High safety, there is no high-pressure pipeline, valve, etc. that can release external force, without the risk of high-pressure injury | 1.5-2.0Mpa high-pressure pipeline leakage may cause operator casualties, high safety management requirements. |
Existing Facility Connection | No dismantling of equipment, no crazy occupation of land, no increase in power distribution capacity, can be quickly docked with the existing sludge dewatering facilities in sewage plants. | Demolition of the old, a large area of additional land, sewage plant distribution capacity increase of 10-15% |
Processing equipment | WKLS Sludge Deep Dewatering Machine | Frame plate diaphragm filter press | Electro-osmotic sludge high dry dewatering machine |
Treatment method | Sludge modification chemicals, sludge belt-type high-pressure deep dewatering | Sludge surface activation modification and high pressure diaphragm filter press deep dewatering | electro-osmotic dehydration Applying a certain DC voltage to the sludge Dewatering by using the phenomenon that sludge particles and water molecules move separately in opposite polarity directions. |
Running Costs | RMB 50-80/tonne (sludge with 80% water content) | 80-120 RMB/tonne (sludge with 80% water content) | RMB 150-200/tonne |
Floor space | 25m3 | 70m3 | 15m3 |
Water content of sludge | From 80% to less than 60 | ||
Working method | Continuous operation | Intermittent operation | Continuous operation |
Technical difficulty of operation | Fully automatic control easy to operate, stable operation, need to consider spare parts and spare machine | Semi-automatic, manual cake unloading required, stable operation, spare parts and spare machine required | Fully automatic control easy to operate, stable operation, need to consider spare parts and spare machine |
Weather impact | None | ||
Safety | Normal temperature safety |