Supply Smokeless Waste Incinerator for Laboratory Waste Incineration

Product Details
Customization: Available
After-sales Service: Long Time
Warranty: 12months
Manufacturer/Factory, Trading Company
Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
  • Supply Smokeless Waste Incinerator for Laboratory Waste Incineration
Find Similar Products

Basic Info.

Model NO.
hc
Condition
New
Certification
ISO, CE
Automation
Semi-Automatic
Screw
Twin-Screw
Treatment
Pyrolysis
Gas Equipment
Water Dispenser
Transport Package
Wooden Case
Trademark
HC FLOURISH
Origin
Made in China
HS Code
8417809090
Production Capacity
1000

Product Description

Introduction:
Waste incinerators use incineration technology and equipment to dispose of all kinds of animal carcasses, feces. Medical solid waste, laboratory solid waste
The device has the following characteristics:
Well-designed, small footprint; Simple operation and easy maintenance; Energy saving, safe and reliable; Low price,
Long operational life.
The equipment technology advanced, sophisticated consistent quality, the full realization of solid waste treatment "harmless, non-quantitative, safe."
Fixed"processing. It is a good setting for all types of farms, livestock pastures, veterinary hospitals, zoos and laboratories to safely dispose of solid waste
prepare.
Processing capacity 30-500kg/time.
The incinerator meets the needs of all-weather operations, can run continuously and intermittently, with an annual run time of not less than 8000
design life greater than 10 years.
Safety metrics:
1. Before stopping operation, the unit has a test of the combustion chamber cooling procedure, so that the combustion chamber temperature drops to the set temperature
When the incinerator stops - - cuts operation.
2. There is a connection protection device between the control cabinet and the control equipment to avoid leakage, at 85% relative humidity,
Electrical circuit insulation resistance is not less than 24MQ. And there is a succession ground line transmission leakage power supply. Metal hose protection is available outside the connection.
3. This equipment after the technical department verification factory, oil road, gas road and other installation are very solid, and through pressure
Test, there is no leakage phenomenon.
Composition of incinerators:
Furnace body one combustion chamber, secondary combustion chamber, cyclone dust collector, chimney, flue, pipeline system, high-pressure blowing
Machine, sub-pressure fan, one-time burner, secondary burner, and, electrical control cabinet, temperature display device, detection device.
Combustion process and brief description:
Waste by manual input to the furnace body one . . . sub-combustion chamber, automatic temperature control to open a combustion, according to the combustion of three T (temperature).
degree, time, vortex) principle, in the furnace body combustion chamber full oxidation, pyneutic, combustion. The smoke from incineration enters
Into the second combustion chamber , the harmful substances of unburned embers in the flue gas are further destroyed in the second combustion chamber . In order to make the unburned material thoroughly divided
Solution, to meet emission requirements, the second combustion chamber set up a burner to help burn, equipped with a unique secondary air supply device to ensure smoke
Gas in full contact with oxygen at high temperatures, while ensuring that the fumes in the second combustion chamber of the Introduction:
Waste incinerators use incineration technology and equipment to dispose of all kinds of animal carcasses and feces. Medical solid waste, laboratory solid waste
The device has the following characteristics:
Well-designed, small footprint; Simple operation and easy maintenance; Energy saving, safe and reliable; Low price,
Long operational life.
The equipment technology advanced, sophisticated consistent quality, the full realization of solid waste treatment "harmless, non-quantitative, safe."
Fixed"processing. It is a good setting for all types of farms, livestock pastures, veterinary hospitals, zoos and laboratories to safely dispose of solid waste
prepare.
Processing capacity 30-500kg/time.
Incinerators can meet the needs of all-weather operation, continuous and intermittent operation, annual running time is not less than 8000
hours, design life is greater than 10 years.
Safety metrics:
1. Before stopping operation, the unit has a test of the combustion chamber cooling procedure, so that the combustion chamber temperature drops to the set temperature
When the incinerator stops - - cuts operation.
2. There is a connection protection device between the control cabinet and the control equipment to avoid leakage, at 85% relative humidity,
Electrical circuit insulation resistance is not less than 24MQ. And there is a succession ground line transmission leakage power supply. Metal hose protection is available outside the connection.
3. This equipment after the technical department verification factory, oil road, gas road and other installation are very solid, and through pressure
Test, there is no leakage phenomenon.
Composition of incinerators:
Furnace body one combustion chamber, secondary combustion chamber, cyclone dust collector, chimney, flue, pipeline system, high-pressure blowing
Machine, sub-pressure fan, one-time burner, secondary burner, and, electrical control cabinet, temperature display device, detection device.
Combustion process and brief description:
Waste is put into the furnace body by hand. Sub-combustion chamber, automatic temperature control opens one combustion, according to the combustion of three T (temperature
degree, time, vortex) principle, in the furnace body combustion chamber full oxidation, pyneutic solution, combustion. The smoke from incineration enters
Into the second combustion chamber, the harmful substances of the unburned embers in the flue gas are further destroyed in the second combustion chamber. In order to make the unburned material thoroughly divided
Solution, to meet emission requirements, the second combustion chamber set up a burner to help burn, equipped with a unique secondary air supply device to ensure smoke
Gas in high temperature full contact with oxygen, while ensuring that the fumes in the second combustion chamber of the retention time and according to the second combustion chamber to export flue gas
the oxygen content of the adjusted air supply. The temperature control of the second combustion chamber is controlled and the large particle dust is removed by the dust collector to make it
Incineration efficiency and damage removal rate of 99% to, on. Make it odor - free, odor - free and smoke - free. reach the country
Emission standards are then discharged into chimneys into the atmosphere to burn cattle after the ashes are removed by human T, sieve transfer and buried.
Our strengths:
Design life: Incinerators meet the needs of all-weather operation, continuous and intermittent operation, annual running time
No less than 8000 hours, design life is greater than 10 years.
Furnace body shell for steel structure, the inner wall for different properties of fire-resistant casting materials, the inner layer for high-temperature casting, can
It is resistant to high temperatures of 1790 degrees C and has a lightweight refractory material in the middle to ensure sufficient combustion temperature. The housing can also be maintained
Low temperature, in order to prevent burns, refractory material for the overall casting, not easy to fall off, not easy to corrode.
incinerator time and according to the second combustion chamber to export fumes
the oxygen content of the adjusted air supply. The temperature control of the second combustion chamber is controlled and the large particle dust is removed by the dust collector to make it
Incineration efficiency and destruction removal rate of 99% to, on. Make it odor - free, odor - free and smoke - free. reach the country
Emission standards are then discharged into chimneys into the atmosphere to burn the ashes of cattle produced by human T, sieve transfer and burial.
Our strengths:
Design life: Incinerators meet the needs of all-weather operation, continuous and intermittent operation, annual running time
No less than 8000 hours, design life is greater than 10 years.
Furnace body shell for steel structure, the inner wall for different properties of fire-resistant casting materials, the inner layer for high-temperature casting, can
It is resistant to high temperatures of 1790 degrees C and has a lightweight refractory material in the middle, which guarantees sufficient combustion temperature. It also keeps the housing
Low temperature, in order to prevent burns, refractory material for the overall casting, not easy to fall off, not easy to corrode.
incinerator

Supply Smokeless Waste Incinerator for Laboratory Waste Incineration

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier